Knowledge Element: Equipment and Materials preparation

Definition of Knowledge Element:

Know how to prepare tools, equipment and materials so that they will all behave as expected when needed.

A very brief summary of the Knowledge:

Non provided.

A summary of expert opinion:

The knowledge named 'Equipment and Materials preparation' is considered to be very important.
In addition, the knowledge is thought to be quite difficult to replace, it is learned with a study experience balance, and Between 30% and 60% of Group are Experts.
It is also quite specialised knowledge, and generally stable knowledge.
See Parameter table below for more detail.

Risk:

This knowledge element has a risk value of 4.93, whilst the average risk for the whole knowledge structure is 4.862. Consult the RISK page for more details.

Knowledge linked by learning dependency:

Postrequisite knowledge implies that Equipment and Materials preparation must be understood before for a person can gain a full understanding of the knowledge listed in the top row of the Linked Knowledge table.

Equipment and Materials preparation has no prerequisite knowledge items and is therefore known as a leaf node. A leaf node is knowledge that has not been investigated further when the map was constructed.

Parameters assigned for Equipment and Materials preparation.

Parameter Details for: Equipment and Materials preparation
Identifier Name Value Clarifier Weight Study Mean
P1
Importance
7.0
very important
1.0
6.34
P2
Recovery
4.0
quite difficult to replace
1.0
3.38
P3
Study-Exp
4.0
learned with a study experience balance
1.0
3.46
P4
Known By
4.0
Between 30% and 60% of Group are Experts
-1.0
2.80
P6
Specialised
5.0
quite specialised knowledge
1.0
5.05
P7
Stability
7.0
generally stable knowledge
-0.7
6.41

People Involved with Equipment and Materials preparation:

PersonExpertCapableResponsible
M A Smith
---
Yes
---
A A Pendragon
Yes
---
---

Computed Similarity

The most similar node to Equipment and Materials preparation is System testing.

The most dissimilar node to Equipment and Materials preparation is Service Evaluation.